How my railroad interests moved from the Pacific Northwest to Southern New South Wales .....with a stop over in Southern California


Wednesday, July 14, 2010

Finally - Some Progress!!!!







Hot
Well....it's July in Texas.

Time to get motivated for anything that keeps you in air conditioned 
comfort.

So, that means time to stop procrastinating on starting the scenery.

A couple of months ago, in an unusual spurt of energy, I tried out 
the hydrocal soaked paper towels over screen on a curve leaving 
Willow Tree.   I was very displeased with the result.   So this time 
I'm trying Sculptamold  (a cellulose based modeling compound similar 
to papier mache)

I spent an hour in the big box home improvement store trying to 
choose a brown latex paint color that i thought would be a good base 
for the soil in the area I'm modeling.  You can mix watered down paint 
with the Scuptamold to avoid white areas, should the top layer get 
chipped.


Here is the test area before sculptamold (the white area on the curve 
is the plaster-soaked towel experiment):























I added very little support under the screen, so it took 4 separate 
applications over a 1 week period, letting each one set for a couple 
of days to build up strength.  

The results were much more acceptable.  A little on the coarse side, 
but a little sanding should smooth everything out.  My choice of 
brown for earth color ended up being a little lighter than I was 
hoping....but I guess it's better to be too light than too dark.  
Painting during later scenery stages can darken it up.

The brown doesn't really photograph too well....
but here are the results:

Guess I better stock up on the Sculptamold...
summer has a long way to go!


Saturday, March 13, 2010

New Arrivals

I was roused from a cold medicine induced daze this afternoon by the doorbell (and the dogs).  It was mail delivery lady with a parcel bearing an Australian postal label.   A long ago ordered and greatly anticipated wagon order from Auscision had finally come.


12xNDFF ballast wagons and 4xCQBY container wagons.  Once again....they are outstanding models.


I spent a few hours this evening installing 60 feet more fascia to the upper level, and when I finished around 0300....decided to unpack the new arrivals for some pics:


Southern Short Haul B61 exits Ardglen Tunnel

Brake van substituting for needed ballast plow passing Ardglen crossing loop

12xNDFF placed on Ardglen quarry sidings

Someday I'll learn how to photoshop in a background like Blair...for now, we'll all just have to imagine.

With these arrivals, all the Aussie rolling stock I ordered 2 years ago, has arrived...with the exception of the Trainorama Southern Shorthaul GM22 which is apparently still a year away.

Time to start shopping again!

Sunday, February 14, 2010

It's a Winter Wonderland!.....in Texas???!!!

The TV weather forecasters had been predicting our second "winter weather event" of the year for a couple of days.  One to three inches of snow or mixed snow and rain.  


It started snowing around 0400 on Thursday. By the time Emily was ready to go to work around 7, it was still coming down, and we decided I since I was on days off,  that we could go out for breakfast and I could drop her off and pick her up in the evening when she finished.  


By the time we were done eating, it was looking a bit worse so she decided just to stop by work, get her laptop and work from home.   Good decision.


Here is the main street of our subdivision about 5 hours after the snow started:



By afternoon, there was so much snow that Emily got the car stuck in our driveway trying to leave.  45 minutes later, the car was safely tucked back into the garage, where it would remain for another 24 hours.

It snowed for 18 hours and dropped around 14" at our house, and set all time snowfall records for the area.  I spent 3 hours shoveling the sidewalks and driveway Thursday afternoon,  only to have 4 more inches fall overnight.


Luckily, in spite of the "quality" of Texas home construction....the roof stayed up and didn't leak.  Unfortunately, the same couldn't be said for the Texas Live Oak trees.  We lost some good portions of many of the trees around the property.  Something for me to work on when the snow melts away.  The trees on the right in this photo suffered pretty significant damage.


Blog required Model Railway content:  I installed 13 more Blue Point turnout throws this past week.

Oh.....and we're sick of being in the "frozen North"...next week we're heading south to Mexico (the real one) and spend a few days on the beach!



Saturday, January 30, 2010

A Photo Overview of the Railway

Procrastination.   Unfortunately one of my strong traits.   


I finally got a little clean up done in the layout room, not perfect as the  photos will show...but good enough to allow me to present the current state of affairs in my little corner of New South Wales.  


The main locations are labeled.  Hopefully, that will aid in locating the scenes on the track plans in the last post.  The last time I attempted...trains would run the entire length of the railway....I'm sure a bit of track cleaning would be in order to duplicate that feat.


First up, a little prototype comparison:
Willow Tree as viewed from Merriwaw Road.  Willow Tree will be a main focal point on the Rwy, as it is the first thing viewed when entering the room.  Also will be a main operational point as this is where I will be adding bankers to all the Pacific National bulk commodity trains.





The remainder of the shots will show most areas of the room.  



Notice the grade leaving Willow Tree in the background curving up to Kankool (behind the camera to the right).  I didn't want to give up the space for a helix, so the grade to the upper level will require bankers.  A non-prototypical  issue that had to be overlooked when this was modeling Southern California.










This photo of the Maitland staging yard shows how the tracks run into the cabinets over Emily's desk in the office portion of the room.  The remodeling of the office was a good trade-off to secure air rights over the desk that allowed for the "Million Dollar Staging yard" 


Last night's premier operating night at Blair's railroad has once again inspired me to get busy.  I have 20 more Blue Point point throws to install, and finish laying track and installing the turntable at Werris Creek loco depot.  

Then,time to think about scenery....

Oh No...I feel more procrastination in my future!

I'll need to keep looking at the photos of Ray's Bylong layout for inspiration

Sunday, December 20, 2009

My Modeling History - Part 4 - Goodbye So. Cal...Hello NSW!

My 2007 trip to Australia completely hooked me on attempting to model the railways down under.  I returned to the states with a few models picked up during my travels:  a CFCLA 44 class, a Freight Australia X class, a couple of 4 packs of Train-o-rama freight wagons and a Train-O brake van.  


Now what to do with them?


I made the decision at that point to model fairly current operations in New South Wales (probably because I spent most of my gunzeling time in NSW), but where to focus?   I spent my time there on the Main West to Parkes and the Main South to Junee...both provided enough traffic and variety to make modeling interesting....but both had significant sections of double main line, which would complicate the modeling and reduce the amount of line I could model in the space available.  


In the books & magazines I acquired, I started reading about the Main North from Maitland to  the Northwest of the state.  Mostly single line working with Grain, coal, goods...multiple operators, AND  .....  Bankers!  (helpers or pushers to the yanks among us)  A quick mail order purchase of 2 Ardglen Banker DVD's pretty much made up my mind, but the below video found on YouTube sealed the deal:





It just can't get any better than that!! Alcos front and rear and mountain scenery...everything that I've always loved.

I started pouring over the ARTC website for track charts, maps and schedules and made an AMAZING discovery. The layout I had build for my Santa Paula Branch of the SP, would convert with virtually no changes to the line between Muswellbrook and Werris Creek!!!!

I just had to lengthen a couple of passing loops and remove 17 goods sidings and 1965 Southern California became 2006 Northwest New South Wales.

In the track plan below, Maitland Staging was Los Angeles, Willow Tree was Fillmore (the town I grew up in, Werris Creek was Oxnard, and Tamworth / Narrabri Staging was Northern California staging.

In the drawings, not all sidings are show.










The original railroad had a significant grade to transition from the main level to the upper level.  On The SP model, the grade had to be ignored since it wasn't there on the prototype...trains had to be powered up enough to climb it unassisted:






But it fell in the perfect position for Ardglen Bank, and, since I'm modeling current times and there isn't any loose goods business, the grade and use of bank engines will become the focal point of the new railroad:





Next up....I'll do a little cleaning and share a few photos of the current state of the railway.

Wednesday, December 9, 2009

My Modeling History - Part 3 - The SP of My Childhood




The year is 1965, the location is Fillmore, California...about 45 miles north of Los Angeles on Southern Pacific's Santa Paula Branch.  The train is the San Francisco to LA Coast Mail, detouring due to a derailment on the Main Line.  The boy on the right at the crossing is me, along with my younger brother.    This painting, a composite of several actual events was commissioned from noted U.S. rail artist John Winfield ( http://www.winfieldart.com/wpg2 ), and pretty well represents my next model railroad attempt.

From 1964 thru graduation from high school in 1975, I grew up in this small, 4500 resident town...a mountain range away in distance, but a world away in culture, from America's 3rd largest city.   The Southern Pacific line came to town in 1886 as their main line between LA and San Francisco.  By 1904 the line was bypassed by a lower grade, more direct route and became a 50 mile parallel branch line for the rest of it's existance.  The route is the upper of the 2 in the map below (Fillmore is pretty much right in the middle of the branch):



Fillmore station sometime near the turn of the century

The eastern 3rd of the line (east of Piru) washed out during floods in the late 1980's and was never rebuilt. The Southern Pacific (now Union Pacific) sold most of the line by the early 1990's and what remains is operated by a short line, and used mostly in tourist train, and Movie/TV work.


My modeling premise, was that the cut off had never been built and Fillmore was still on the main line in 1965.  


The job change and move to Fort Worth brought with it the chance to start a new railroad.  We bought 1.5 acres on the edge of the city and had our home designed to our wants by an architect  niece of Emily's.  I ended up with an "L" shaped train room, roughly 20' x 33'.  After a year or so of inactivity, I finally came up with the idea for the railroad and construction began.


What I ended up with was a point to point railroad, varying from 1 to 3 levels circling the room twice.  Los Angeles staging was on the upper level, the railroad traveled through Saugus, Piru, Fillmore, Santa Paula, Montalvo and into the yard at Oxnard, before leaving for the lower level staging which represented Northern California.  The main traffic generated on line was from the citrus industry, with about 9 modeled fruit packing houses.  The yard at Oxnard originated several locals daily to service these locations.  Through freight traffic consisted of several trains each way per day, and there were 2 passenger and a mail train daily, following the actual Southern Pacific operations of 1965.





I used the new RR as my opportunity to switch to DCC, and used several trips to So. Cal to photograph the remaining infrastructure and disappearing fruit packing houses.  Track work was completed around 2005 and one half-assed operating session was run in 2006.





Credit for much of the motivation and help in construction go to all the members of the "Thursday Night Jazz and Pie Club", a group of modelers in the Dallas / Fort Worth area, that would meet every few weeks to work on each others' railroads.  Also credit to Donovan Furin for the beautiful Southern California backdrop (which is currently being reborn  in the Southern hemisphere!)


Unfortunately for the Santa Paula branch, I started receiving forwarded email photos taken in far away New South Wales by soon-to-be friend Charlie Harris that were capturing my interest and the sight of Alcos and bulldog locos still operating in everyday service proved to be too much.  


A vacation trip down under in 2007, and the purchase of some Australian models drove the last nail in the coffin of the Southern Pacific.   The boxes of SP equipment have been slowly disappearing on Ebay, and the proceeds from those sales will be used to buy up necessary equipment for the next phase of my modeling life.....but what will that be?


Tuesday, November 24, 2009

My Modeling History - Part 2 - Cascade Railway



My first year working for Burlington Northern just happened to coincide with the final 8 months of operations of their Alco locomotive fleet.     Being around the smokey, chortling, four-cycle engined, beasts day and night had me hooked from then on.  Once you've heard a single C-636 start a heavy transfer drag on a cold, clear night....you'll never be satisfied with the products of EMD.

Around late 1980, I moved into a rental house with a 2 car garage that immediately became the home of my new model railroad.  I eventually decided to free-lance this one,  a bridge road in the Pacific Northwest, connecting Western Washington with South Central Oregon.  In the manner of the yet to be created Montana Rail Link, The Cascade Railway would operate it's own freight trains and locals, but would also host long distance trains of the Burlington Northern.

The modeled Cascade was an E shaped point to point railroad representing 1 subdivision of the ficticious  system.  Home road power was an assortment of mostly 4 axle Alco roadswitchers with a couple of end cab switch engines for yard duties.  There were 2 paint schemes used,  a slightly simplified version of the Canadian Pacific gray & maroon represented the original scheme and the modern paint  a bright red and black  ( a la Washington Central).  The modern logo represented a volcanic mountain in front of a full moon (actually a CP Rail loco on its' side)


The Cascade wasn't a portable railroad, but it was built strong enough to make a move across town in 1989,  when the home I had built was completed.  I had a 3 car garage built with only a single car garage door...so 1 stall for the vehicle and, after the railroad was hauled over on a trailer and moved in,  a 24' x 24' walled off room for the Cascade system.

The railroad was completed to a stage where operating sessions were held every month or two, using up to 6 operators.  It reached a point where scenery was just getting started...and the management decided to go out and sample locomotives from EMD:



Finally in late 1997,  I decided I needed to upgrade the railroad room by adding carpet.  Sooooo, being a normal modeler...I chose to tear down the entire railroad to make it easier....and to come up with "something even better!"  Alas, it never happened.   After 20 years in the rain of Washington , and the depressing prospect of spending another 20 as an engineer on the same piece of track in the rain...the opportunity came up for Emily (wife & also a BN/BNSF employee) and I to make  career changes....and a move to Texas of all places!

Next:  Part 3....Fort Worth and the SP Santa Paula Branch